As the world‑largest water conservancy hub project, the Three Gorges Project imposes extremely high requirements on material quality for every component. In September 2005, all 14 generating units on the left‑bank power station of the Three Gorges Project were connected to the grid for power generation, marking a major milestone in its construction. The epoxy resin insulation materials deployed for the high‑voltage GIS facilities of the left‑bank power station were supplied by Shanghai Xrun.
To date, Xrun’s products have been running reliably at the Three Gorges Project for 21 years. Subjected to long‑term field operation, they consistently deliver sound insulation performance and mechanical strength. This track record fully demonstrates the premium quality of Xrun epoxy resin products, as well as the company’s profound technical expertise in medium‑ and high‑voltage electrical insulation materials. Xrun will keep delivering dependable product quality to safeguard China’s major power engineering projects.
